Shop Time
Overhead · not billed
0.0 hrs
This Week
$0
0.0 hrs
This Month
$0
0.0 hrs
Year to Date
$0
Site Walk
Ready0
Active0
Engineering
Ready0
Active0
Permitting
Ready0
Active0
UG Construction
Ready0
Active0
OH Construction
Ready0
Active0
Fiber Placement
Ready0
Active0
Const. Close-Out
Ready0
Active0
Splicing
Ready0
Active0
Splice Close-Out
Ready0
Active0
Stalled
21+ Days Quiet
0
Needs Direction
No Ready/Active
0
Overdue
Past Target
0
Ready - Final Invoice
$0
0
All Portals A-R Pipeline
$0
0
All Projects 0
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % | |
|---|---|---|---|---|---|---|---|---|---|---|
TEST | Zayo Bandwidth | QuoteFeasibilityEngineeringUG Const.SplicingInvoicing | Dave Bustamante | — | P1 | 0% | T&E | — | ||
No notes yet. | ||||||||||
🔴 Needs Attention
No alerts — all clear ✓
By Client — YTD Projects
ZA
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % | |
|---|---|---|---|---|---|---|---|---|---|---|
TEST | Zayo Bandwidth | QuoteFeasibilityEngineeringUG Const.SplicingInvoicing | Dave Bustamante | — | P1 | 0% | T&E | — | ||
No notes yet. | ||||||||||
🔗 Splice-only Projects
0 jobs · $0
No projects yet — create one to get started |
🔎 Conflict Resolution Requests
0 requests · $0
No projects yet — create one to get started |
📄 ENG & Permitting Jobs
0 jobs · $0
No projects yet — create one to get started |
1
Project Information
2
Financial
Drag & drop a file here, or click to browse
Drag & drop a file here, or click to browse
3
Active Phases
4
Team Assignment
JS
Jacob Self
CP
Chris Powell
CH
Cole Hardin
BW
Brandon Wilson
DB
Dave Bustamante
JL
Justin Lisch
JB
Jacob Barnes
1 projects · $0
📄 Ready for Engineering
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % | |
|---|---|---|---|---|---|---|---|---|---|---|
TEST | Zayo Bandwidth | QuoteFeasibilityEngineeringUG Const.SplicingInvoicing | Dave Bustamante | — | P1 | 0% | T&E | — | ||
No notes yet. | ||||||||||
1 projects · $0
🔨 Ready for Construction
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % | |
|---|---|---|---|---|---|---|---|---|---|---|
TEST | Zayo Bandwidth | QuoteFeasibilityEngineeringUG Const.SplicingInvoicing | Dave Bustamante | — | P1 | 0% | T&E | — | ||
No notes yet. | ||||||||||
0 projects · $0
📜 Ready for Permitting
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
0 projects · $0
📜 Permitting — Active
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
0 projects · $0
⛏️ Ready for UG Construction
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
0 projects · $0
⛏️ UG Construction — Active
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
0 projects · $0
🪜 Ready for Aerial Construction
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
0 projects · $0
🪜 Aerial Construction — Active
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
0 projects · $0
🧵 Ready for Fiber Placement
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
0 projects · $0
🧵 Fiber Placement — Active
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
0 projects · $0
📦 Ready for Splicing Close-Out
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
1 projects · $0
🔗 Ready for Splicing
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % | |
|---|---|---|---|---|---|---|---|---|---|---|
TEST | Zayo Bandwidth | QuoteFeasibilityEngineeringUG Const.SplicingInvoicing | Dave Bustamante | — | P1 | 0% | T&E | — | ||
No notes yet. | ||||||||||
📘 Engineering (All Types) — All projects with strictly active Engineering or Permitting work, plus Conflict Resolution requests. Includes engineering-only short-scope projects and any full-scope project actively in an engineering phase. Projects that are queued (Ready, On Deck) live on the Ready — Engineering view.
0 projects · $0
📘 Active — Engineering (All Types)
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
🔨 Construction (All Types) — All projects with strictly active construction work (UG Construction, Aerial Construction, Fiber Placement, or Construction Close-Out). Includes full-scope construction, splice-only projects with construction needs, and active outage/emergency projects. Projects that are queued (Ready, On Deck) live on the Ready — Construction view.
0 projects · $0
🔨 Active — Construction (All Types)
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
🔌 Splicing (All Types) — All projects with strictly active Splicing or Splicing Close-Out work. Includes splice-only projects, full-scope projects in splicing phases, and outage projects requiring splicing. Projects that are queued (Ready, On Deck) live on the Ready — Splicing view.
0 projects · $0
🔌 Active — Splicing (All Types)
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
📋 Splicing Close-Out — All projects with an active or pending Splicing Close-Out Package. This is a required documentation deliverable for our customer covering test results, OTDR traces, splice maps, and project completion records.
0 projects · $0
📋 Splicing Close-Out
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
🏗️ Construction Close-Out — Projects whose construction work (UG, Aerial, Fiber Placement) is complete but still owe construction-team deliverables: as-builts, redlines, GPS data, photos. Required before splicing can start.
0 projects · $0
🏗️ Ready for Construction Close-Out
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
🏗️ Construction Close-Out (Active) — Projects with Construction Close-Out work currently in progress. As-builts, redlines, GPS, and photo deliverables owed before splicing.
0 projects · $0
🏗️ Construction Close-Out
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | % |
|---|
🔧 Restoration & Clean-up — Projects with restoration work, yard repairs, punch list items, or other follow-up tasks owed. Includes auto-flagged construction projects awaiting QC walkthrough sign-off, plus any project manually flagged with a follow-up note. Click QC Complete on a row to sign off (requires a note).
0 projects · $0
🔧 Restoration & Clean-up
| Project | Client | Reason | Owner | Type | PO Value | QC |
|---|
📥 Project Staging — Incoming project leads waiting to be reviewed and promoted to real projects. Entries can come from email (
claude@gsp-networks.com with new and project in the subject, any order) or manual entry. Click a row to view details, then Promote, Reject, or Merge.
0 entries
📥 Staged Projects
| Age | Source | From | Customer | Site | Scope | Status | Dup? |
|---|
⏸️ On Hold — Projects manually paused. All future-dated crew schedule entries were cleared when the project was placed on hold. Use the Edit Project modal to bring a project back off hold.
0 projects · $0
⏸️ Projects On Hold
| Project | Client | Contact | Held Since | Held By | Owner | Type | PO Value |
|---|
✉ Inbox — Unread notes on projects you're tagged on. Click a note to read it — that clears it from your inbox. Nothing clears just from opening a project.
🚧 Stalled — Active projects with no activity in the last 21 days. These need a check-in: someone should follow up, log progress, or move it to On Hold if it's intentionally paused.
0 projects · $0
🚧 Stalled Projects
| Project | Client | Status | Owner | Type | Last Activity | PO Value |
|---|
🚧 Needs Direction — Active projects with no tasks currently active or ready to start. These projects cannot move forward until someone plans, schedules, or unblocks the next task.
0 projects · $0
🚧 Needs Direction
| Project | Client | Status | Owner | Type | Last Activity | PO Value |
|---|
🔗 Combo Projects — Projects spanning two or more work types (Engineering, Construction, Splicing). The phase break-out happens on the dashboard cards.
0 projects · $0
🔗 Combo Projects
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
🏗️ Construction Only — Projects whose present phases are exclusively construction (UG, Aerial, Fiber Placement, Construction Close-Out). No engineering or splicing scope.
0 projects · $0
🏗️ Construction Only
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
📐 Engineering Only — Projects whose present phases are exclusively engineering and/or permitting. No construction or splicing scope. (Different from Eng Scope, which includes any project that touches engineering, combos included.)
0 projects · $0
📐 Engineering Only
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
❓ Needs Scope — Active projects with no tasks selected at all (every phase still N/A). These won't appear in any Project Type bucket until a phase is set. Open each and select its work phases. Different from "Needs Direction," which has tasks but none in a Ready/Active state.
0 projects · $0
❓ Needs Scope
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date | % |
|---|
⚠️ Needs Attention — Active projects that are past their due date and need follow-up. Use the dashboard to drill in and reassign, reschedule, or update status.
0 projects · $0
⚠️ Overdue Projects
| Project | Client | Status | Created | Type | Priority | Activity | PO Value | Due Date |
|---|
Est. $0 pending
💰 Ready — Invoicing
| Project | Invoice Sent | Type | Client | Contact | Contact Email | Quote # | PO # | Amount | Action |
|---|
$0 needs reverse quote
📝 Waiting — Needs Quote
Work is complete. Send the customer a "what we did" quote so they can issue a PO.
| Project | Client | Status | Created | Days Waiting | Type | Priority | Activity | PO Value | % |
|---|
$0 waiting on PO
📄 Waiting — PO
Work is complete and the quote is out. Waiting on the customer's PO before invoicing.
| Project | Quote Sent | Date Sent | Days Out | Type | Client | Contact | Quote # | Amount | % |
|---|
Awaiting Approval
To Be Quoted
✉ To Be Quoted
Awaiting Approval
To Be Quoted
📝 All Quotes
52 quotes · $1,328,231.39 total · $1,090,482.99 open · $237,748.4 won
| Quote # | Description | Customer | Amount | Submitted - | Status | Notes | |||
|---|---|---|---|---|---|---|---|---|---|
| 1438 | County Main St. Panel Remove & Replace (144 Terms) | City of Marysville | $7,511 | PO Received | 252411 | ||||
Legacy Ready - Need Outage Scheduled | |||||||||
| 1657 | Pump Station #4 (Splicing Only) | City of Marysville | $2,157 | PO Received | 252412 | ||||
Legacy Splicing To Be Scheduled | |||||||||
| 1913 | 6th & Main UG Transition / Relocation | City of Marysville | $37,871 | Submitted | — | ||||
Legacy Scheduled | |||||||||
| 1959 | County e911 Diversity Splicing | City of Marysville | $3,800 | Submitted | — | ||||
Legacy Needs 6th & Main completed | |||||||||
| 2050 | Walmart Traffic Cabinet | City of Marysville | $61,768.5 | Submitted | — | ||||
Legacy Start Engineering | |||||||||
| 2051 | Watkins Pump Station to URE | City of Marysville | $78,954 | Submitted | — | ||||
Legacy Start Engineering | |||||||||
| 2052 | Industrial & Brock Pump Station | City of Marysville | $124,840 | Submitted | — | ||||
Legacy Start Engineering | |||||||||
| 2273 | 5 Points Relocation Project | City of Marysville | $61,013.75 | Submitted | — | ||||
Legacy Start Engineering | |||||||||
| 1624 | Springboro - East St. Remaining | MVECA | $17,650 | Submitted | — | ||||
Legacy Change Order Needed (~$5000) | |||||||||
| 1711 | Washington Twp Fire | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 1898 | Tecumseh High School | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 1967 | Additional Springboro Splicing | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 1968 | Xenia Splicing | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 1982 | Washington Court House | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 2129 | East Clinton Schools | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 2238 | New Traffic Cabinets | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 2260 | 136 S. Ludlow St | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 2312 | Green County Airport | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 2297 | PSEC Fiber Install | SWOCA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
| 2186 | East Liberty | Union Rural Electric | $73,565.5 | Submitted | — | ||||
Legacy Needs Substation & Splicing | |||||||||
| 2187 | West Marysville | Union Rural Electric | $80,673.3 | Submitted | — | ||||
No notes yet. | |||||||||
| 2188 | East Logan | Union Rural Electric | $271,505.5 | Submitted | — | ||||
No notes yet. | |||||||||
| 2115 | Olentangy Schools Misc. Fiber Work | Olentangy Schools | $21,032.3 | PO Received | 2604871 | ||||
No notes yet. | |||||||||
| 2125 | Shale Meadows to Peachblow Crossing | Olentangy Schools | $84,857.1 | PO Received | 2604872 | ||||
No notes yet. | |||||||||
| 2272 | RR Fees | Olentangy Schools | $7,337 | Submitted | — | ||||
No notes yet. | |||||||||
| 2007 | Remaining remediation Work | DriveOhio | $13,060 | PO Received | PO00260004 | ||||
No notes yet. | |||||||||
| 2141 | Connectivity issues found at ITS sites 9, 22, 23, 29, 40. | DriveOhio | $3,506 | PO Received | PO 00278705 | ||||
No notes yet. | |||||||||
| 2296 | Industrial & 42 Relo | DriveOhio | $92,593.1 | Submitted | — | ||||
No notes yet. | |||||||||
| 2233 | DEM-13 Conflict Analysis (2300756) | Duke Energy | $2,000 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2234 | HMA Overaly I-74 Crawfordsville Des (2301106) | Duke Energy | $2,000 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2236 | Shelbyville EVP (2401642) | Duke Energy | $0 | Submitted | — | ||||
Legacy Analysis Complete - Waiting on Scope | |||||||||
| 2237 | PUMS Initial Notice - Des (2400860) | Duke Energy | $2,000 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2292 | Michigan Rd and Progress Pkwy Roundabout - Shelbyville IN | Duke Energy | $2,675 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2294 | US 36 Roundabout DES 2401387 | Duke Energy | $2,000 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2299 | Mason Ohio - Butler Warren Rd (IKE) | Duke Energy | $1,909.38 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2300 | Franklin Additional HH's (Anna) | Duke Energy | $1,100.43 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2301 | Connerville HH Drop Off (Anna) | Duke Energy | $1,121.25 | Submitted | — | ||||
Legacy Complete | |||||||||
| 2085 | Springfield - 6001 Benjamin | Zayo Bandwidth | $94,225 | PO Received | PO-ZAYO-US-30041380 | ||||
No notes yet. | |||||||||
| 2246 | META QTS Duct run | Zayo Bandwidth | $3,562.5 | Submitted | — | ||||
No notes yet. | |||||||||
| 2247 | ISO0876059 - 1 Owens Corning Pkwy Toledo OH | Zayo Bandwidth | $3,500 | PO Received | US-30056273 | ||||
No notes yet. | |||||||||
| 2263 | ISO-0883910 | Zayo Bandwidth | $7,900 | PO Received | US-30060116 | ||||
No notes yet. | |||||||||
| 2276 | ISO-0691234 - 333 S Eickhoff Rd - na0773 | Zayo Bandwidth | $7,900 | Submitted | — | ||||
No notes yet. | |||||||||
| 2278 | ISO-0860127 175 Tarbell St to 584 E Smithville Western Rd | Zayo Bandwidth | $72,742.78 | Submitted | — | ||||
No notes yet. | |||||||||
| 2302 | Smithville Henry Migration 701 MMR to 733 Basement | Zayo Bandwidth | $6,000 | Submitted | — | ||||
No notes yet. | |||||||||
| 2303 | TTN-0009631186 - Kirby Risk to Henry | Zayo Bandwidth | $10,000 | Submitted | — | ||||
No notes yet. | |||||||||
| 2306 | ISO-0875108 101 E Town St Columbus OH | Zayo Bandwidth | $3,500 | Submitted | — | ||||
No notes yet. | |||||||||
| 2307 | TTN-0009424761 | Zayo Bandwidth | $10,250 | Submitted | — | ||||
No notes yet. | |||||||||
| 2308 | TTN-0009424822 | Zayo Bandwidth | $9,950 | Submitted | — | ||||
No notes yet. | |||||||||
| 2309 | Hot Cut Linn St bridge relocation - TTN-0009717728 | Zayo Bandwidth | $5,500 | Submitted | — | ||||
No notes yet. | |||||||||
| 2310 | F25M-0271688- ISO-0876103- Great Plains | Zayo Bandwidth | $22,400 | Submitted | — | ||||
No notes yet. | |||||||||
| 2311 | ISO-0860127 Damaged Fiber Replacement | Zayo Bandwidth | $12,300 | Submitted | — | ||||
No notes yet. | |||||||||
| 1839 | Yellow Springs Repair | MVECA | $0 | Submitted | — | ||||
No notes yet. | |||||||||
⚡ Extended Outage Response
Outages flagged "Extended Response — Keep Active" live here while multi-day work continues. Once the work is done, use the normal Mark-Ready-for-Invoicing flow on the project to send it to Invoicing.
⚡ Extended Outage Response
0 total
No extended outages — flag an outage's Extended Response toggle on its Edit Project form to see it here. |
⏰ Time & Equipment Log
Field cost logging — all projects
Total Unbilled
$0
DateDescriptionMenHoursProjectBillableStatus
2026-04-09Shift: Day
Crew: Dave Bustamante
dfsd18$0priced
2026-04-09Shift: Day
Crew: Dave Bustamante
dsdd18$0priced
2026-04-09Shift: Day
Crew: Dave Bustamante
things18$0priced
2026-04-08Shift: Day
Crew: Dave Bustamante
Equipment/Materials: sd
sad78$0priced
2026-04-08Shift: Day
Crew: Dave Bustamante
Equipment/Materials: sd
sad78$0priced
2026-04-08Shift: Night
Crew: Dave Bustamante
Equipment/Materials: trucks and things
lots of stuff38$0priced
🚌 Pick-up Truck
13
🚁 Bucket Truck
4
🚲 Splice Trailer
0
🔌 Splice & Test Equipment
0
🚛 All Fleet & Equipment
21 items
| # | Category | Description | Make / Model | Year | Plate / Serial | Driver / Assigned | |
|---|---|---|---|---|---|---|---|
| 1001 | 🚌 Pick-up Truck | White crew cab 4x4 | Ford F-250 | 2024 | PHD5992 | Jacob Self | |
| 1002 | 🚌 Pick-up Truck | White crew cab 4x4 | Dodge 3500 | 2020 | PNY1789 | Denny Chanthachack | |
| 1003 | 🚁 Bucket Truck | White S-cab bucket 4x4 | Ford F-550 | 2019 | PNQ1366 | Ben Peoples | |
| 1004 | 🚌 Pick-up Truck | White crew cab 4x4 | Ford F-250 | 2021 | PNX2924 | Tyler Trout | |
| 1005 | 🚌 Pick-up Truck | White crew cab 4x4 | Ford F-150 | 2019 | PNQ1367 | Chris Powell | |
| 1006 | 🔧 Other Equipment | Macho Nacho Van | Freightliner 3500 | 2014 | PNG5247 | Daniel Beck | |
| 1007 | 🚌 Pick-up Truck | White crew cab 4x4 | Ford F-150 | 2020 | PNY1750 | Cole Hardin | |
| 1008 | 🚌 Pick-up Truck | White Ext cab | Chevy Colorado | 2020 | — | Chase | |
| 1009 | 🚌 Pick-up Truck | White crew cab 4x4 | Dodge 2500 | 2021 | PLU2522 | Trevor (Indy) | |
| 1010 | 🚌 Pick-up Truck | White ext cab 4x4 | GMC 3500 | 2009 | — | Gavin | |
| 1011 | 🚌 Pick-up Truck | Crew cab L bed | Dodge 2500 | 2020 | — | Kuric Buell | |
| 1012 | 🚌 Pick-up Truck | Black crew cab 4x4 | Dodge 2500 | 2021 | POC2731 | Brandon | |
| 1013 | 🚌 Pick-up Truck | Single cab | Ford F-250 | 2022 | PNM3583 | Ben Peoples | |
| 1014 | 🔧 Other Equipment | Line truck | Freightliner T-40 | 2017 | — | Jon Lawson | |
| 1015 | 🚁 Bucket Truck | Box Van | Ford Box Van | 19 | PLB5925 | Jared Rodgers | |
| 1016 | 🚐 Splicing Van | Van sprinter | Ford Van | 22 | PLN5250 | Pete Crook | |
| 1017 | 🚁 Bucket Truck | Line truck | Ford F-750 | 19 | — | Cody Kneisley | |
| 1018 | 🚁 Bucket Truck | White S-Cab Bucket | Dodge 4500 | 2018 | PMG 9894 | Tyler Grimmett | |
| 1019 | 🚌 Pick-up Truck | White crew cab | Dodge 2500 Cummins | 24 | — | Steven | |
| 1020 | 🚌 Pick-up Truck | White crew cab 4x4 | Dodge 2500 Cummins | 2023 | — | Ray | |
| C402529-001 | 🔧 Other Equipment | Forklift | Hyster Eqpt H80XM | — | Shop | Shop |
⏳ Waiting — Payment
0 projects · $0 outstanding
No projects waiting on payment
🗂 Project Archive
0 archived projects
No archived projects yet
🚫 Lost Bids
0 lost bids · $0 total
No lost bids yet
🔒
Change Password
🎨
Appearance
🏢
Sidebar Clients
Choose which clients appear in your sidebar. This is saved per user/device.
☀
Morning Briefing
Choose whose projects to include in your morning briefing email. Saved per user.
Scope
Delivery
Days to send — nothing is sent on a day with no unread notes, whatever is picked here.
Mon
Tue
Wed
Thu
Fri
Sat
Sun
💾
Backup & Database
Database Status
Connected to Supabase
Download a full backup of all portal data as a JSON file. Keep a copy somewhere safe — this is your safety net if anything ever goes wrong with the database.